Chapter 3
Zobrazit stránku 0
1 2 3 4 5 6 ... 39 40

Shrnutí obsahu

Strany 1

Chapter 3

Strany 4

3-1.5 METERS REQUIRED FOR BTS A/T INCLUDING INFRASTRUCTURE:- 1. SMPS:-

Strany 5

3-1.6 GSM NETWORK FREQUENCY Sl. No ARFCN TRANS FREQUENCY IN MHz RECEIVE FREQUENCY IN MHz 1 63 947.6

Strany 6

3-1.7 GSM BTS A/T (Lucent) General:-

Strany 7

BTS A/T started:- Note that the following tests are deleted from the Test schedule. 1. Trans frequency , 2. Check of feeder cable loss, 3. Check

Strany 8

Before starting BTS A/T lock BTS site i.e. all the 3 sectors from OMC-R .Put off the Rack. Again restart and check that all Hardware getting restored

Strany 9

92 VSWR Test:- See Fig. 3-1 for RF cable W/G. There are two types of VSWR meters. 1. Site Master Anritsu or Bird (with power measurement) 2. Bird

Strany 10

93 3-1.8 ALCATEL BTS Please see BTS front view , TRE, and Combiner in Fig. 3-6, 3-7. Alcatel project was launched in DEC 2004. There were three t

Strany 11

94 Before starting Transmission A/T of BTS, lock BTS site from OMC-R, and confirm. Carry out initialization of BTS as

Strany 13

95 There are some tests which are to be seen in RI (Remote Inventory). Simulate the condition and check in RI as follows, 1. Checking of Antenna m

Strany 14

4. If any unit is extracted then display shows as Hardware degraded, if put in then there will be no alarm on display. 5. If VSWR out then LED on T

Strany 15

2. Site Master: - Make: Anritsu and Bird. Anritsu: - Models - S 113 B (5-1200 MHz), See Fig. 3-8

Strany 17

3-1.10 GSM frequency band and Site Mast Agilent Site Master:- Systems Uplink MS-BTS Downlink BTS-MS R GSM-900 876-890 MHz 921-935 M

Strany 19

3-2 - : GSM COVERAGE A/T :- 3-2.1 General - A coverage with content and quality has got to be quite rarity,

Strany 20

3-2.5 Proceed for coverage :- 1. First of all take a local JTO/SDE who knows all important places, gullies of the city where cov

Strany 22

3-2.6 Sample of: - 1. Link budget consideration:- The objective of the link budget is to determine the limiting factors on the RF signal and

Strany 23

3-1.1 Some important abbreviations frequently in use of GSM network:- Sr.no. Abbreviations Long forms 1 G

Strany 25

3.3 TOWER A/T Tie Beam Soil Rest Platform Concreting 6’-8’ Anchor Plate Ring Earth 3-3.1 1] SACFA clearance: - What is

Strany 27

3-3.3 5] Painting of tower as per standard: - The main purpose of tower painting is day time warning to Aircraft and to avoid rusting of tower mater

Strany 28

Rectangular W/G :- 4 GHz - WR 229 6 GHz - WR 137, WR 159,

Strany 29

3-3.5 17] Concreting of tower base plates:-To avoid rusting of base plate, theft of nut and bolts and to keep tower structure undisturbed, concreti

Strany 30

3-3.7 New procedure for Tower A/T :- As per the new circular dated 02/07/2007, Tower A/T should be completed as per new test schedule w.e.f. 01/08

Strany 31 - Tie Beam

3-4 A/T of 15 GHz/ 8 MB, Digital M/W system as a BTS media 3-4.1General:-

Strany 32

3-4.5 Acceptance Testing:- - Carry out test at Location A ands B on laptop, expected Rx level and compare it with survey report. The li